Tools For Taking Off A Hot Mop Roof
If you live in an arid region or an older urban area you may have a large flat roof.
Tools for taking off a hot mop roof. Off the cuff typical range of roof lives not counting repairs if physically pierced maybe 8 20 for built up tar and felt hot mop 10 20 for peel and stick 12 25 or even up to 30 for tpo epdm uv protected pvc like hypalon 30 50 for hdpe. Hot mop tar and gravel roof system. Get 5 off when you sign up for emails with savings and tips. The hot asphalt is laid out evenly with a large heated mop over the surface.
A built up hot mop roof consists of layers of felt and asphalt over a bed of rosin paper. To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet. 6 foot x 1 1 4 in. Hot mopped asphalt roofing hot tar.
It may be covered with a granular roll roofing epdm which is smooth surfaced or modified bitumen which may be smooth or mineral surfaced. Hot mop roofing and torch down roofing are both popular roofing options for flat roofed structures. The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job. They are designed for roofs with shallow pitches where the rise is no more than 4 inches in every 12 inches.
Flat roof doctor 58 346 views. Fits luco mop head adaptors 59101 59101 59200 59300 59400 etc. Both of these options provide an effective way to waterproof a roof creating a base that will stand up to weather while keeping the inhabitants of the building dry. This hot mop roofing application is seen almost entirely in commercial buildings.
Aluminum mop handle 12 6 foot x 1 1 4 inch diameter ribbed aluminum mop handles with bolts. Some flat roofs have hot tar built up roofing which may have a gravel surface. Hot mopped roofs are durable low cost options compared with others types of roofs. Hot mop roofing is a very dirty and somewhat dangerous job it s essentially putting molten asphalt tar over a roof.
A flat roof is usually slightly sloped. Ability to cover unusually shaped roofs. At the same time a 90lb felt or modified bitumen cap sheet which is a type of asphalt that is modified with rubber or fiber is applied onto the hot asphalt. This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.